Author Archives: Gareth Prior

Reliability and punctuality hit on NET

As with many transport systems in the UK the months of July and August were a challenging period for Nottingham Express Transit with high staff absenteeism (relating to Covid self-isolation) leading to a fall in reliability and punctuality. The latest … Continue reading →

Posted in Nottingham Express Transit | Comments Off on Reliability and punctuality hit on NET

What’s New on British Trams Online? 12th September 2021

This week’s main site update again brings you two new photo collections with images taken recently on Manchester Metrolink and at the Seaton Tramway:

Posted in Manchester Metrolink, Seaton Tramway, Site News | Comments Off on What’s New on British Trams Online? 12th September 2021

In Pictures: Metrolink 3130 arrives in Manchester

After a couple of weeks where there were no new M5000s waiting to enter service on Manchester Metrolink, the latest tram has now been delivered to Queens Road Depot with 3130 turning up in the standard late morning/lunchtime Saturday slot … Continue reading →

Posted in Manchester Metrolink | Comments Off on In Pictures: Metrolink 3130 arrives in Manchester

Confirmation of four more Metro trains ordered

Nexus have now confirmed the additional order of four trains for the Tyne and Wear Metro network to bring the total that Stadler are manufacturing for the network to 46. An initial order of 42 was announced last year and … Continue reading →

Posted in Tyne and Wear Metro | Comments Off on Confirmation of four more Metro trains ordered

Around the World in Trams: Amsterdam Works Car

For the next few editions of “Around the World in Trams” we are heading to Amsterdam in the Netherlands during 1983 to take a look at what was out and about on the lines at this time.

Posted in Around the World in Trams | Comments Off on Around the World in Trams: Amsterdam Works Car

Exchange Square to close for improvement works

There will be no trams running via Manchester Metrolink’s Second City Crossing (2CC) for a week from Monday 13th to Sunday 19th September with improvement works taking place at Exchange Square tramstop.

Posted in Manchester Metrolink | Comments Off on Exchange Square to close for improvement works

Out and About: Green tram in Sheffield

“Out and About” continues today as we head off to Sheffield once more to see images of the newest livery in the city.

Posted in Out and About, South Yorkshire Supertram | Comments Off on Out and About: Green tram in Sheffield

In Pictures: How to travel in style to your wedding!

There are many ways to travel to or from your wedding, but its not often that you see the happy couple doing so on a modern tram! But that is exactly what happened on Thursday 9th September in Sheffield with … Continue reading →

Posted in South Yorkshire Supertram | 1 Comment

Track replacement works on Phoenix Park line to see weekend closure

There will be no trams running between Highbury Vale and Phoenix Park across the weekend of 25th and 26th September to allow for track replacement works to take place. Throughout the weekend trams from Clifton South will terminate at Bullwell … Continue reading →

Posted in Nottingham Express Transit | Comments Off on Track replacement works on Phoenix Park line to see weekend closure

Picture in Time: Blackpool Balloon 701 & Brush 623

Today’s “Picture in Time” is again featuring the Blackpool Tramway as we head north to Fleetwood.

Posted in Blackpool Tramway, Picture in Time | 1 Comment

Work starts on Seaton Wetlands Halt

After several years of delays, work has finally got underway at Swan’s Nest Loop on the Seaton Tramway to construct the new Seaton Wetlands Halt which will become the fifth stop on the three-mile line between Seaton and Colyton.

Posted in Seaton Tramway | Comments Off on Work starts on Seaton Wetlands Halt

NET become 700th organisation in East Midlands to sign Armed Forces Covenant

Nottingham Express Transit have shown their commitment to being an Armed Forces friendly organisation by becoming the 700th organisation in the East Midlands to sign the Armed Forces Covenant.

Posted in Nottingham Express Transit | Comments Off on NET become 700th organisation in East Midlands to sign Armed Forces Covenant

London’s cable car looks for new sponsorship as 13 million journeys recorded

Since opening in summer 2012, London’s cable car, which runs between the Greenwich Peninsular and the Royal Docks, has seen over 13 million journeys recorded and now Transport for London are looking for a new sponsor with Emirates 10 years … Continue reading →

Posted in General | Comments Off on London’s cable car looks for new sponsorship as 13 million journeys recorded

In Pictures: Trams to Newhaven project works at Picardy Place

When the Trams to Newhaven extension of Edinburgh Trams opens in the next couple of years the current terminus at York Place will be swept away and replaced by a new stop at Picardy Place – which will become the … Continue reading →

Posted in Edinburgh Trams | Comments Off on In Pictures: Trams to Newhaven project works at Picardy Place

In Pictures: Wilko’s construction update

With the cherry pickers which had been situated in Talbot Square while the overhead installation had started now having gone it would appear that work will not be progressing at the moment but there is still work taking place up … Continue reading →

Posted in Blackpool Tramway | Comments Off on In Pictures: Wilko’s construction update

Lift upgrade work completed

The work which has been taking place over the past couple of months to upgrade lifts at two West Midlands Metro stops has now been completed, giving full step-free access to the stops once more.

Posted in West Midlands Metro | Comments Off on Lift upgrade work completed

Update on Rigby Road Depot

Earlier this year, we reported on the launch of Blackpool Transport’s crowdfunder to raise £1 million to repair Rigby Road Depot’s roof. Now three months down the line and a further update with details of what they are trying to … Continue reading →

Posted in Blackpool Tramway | Comments Off on Update on Rigby Road Depot

New weekly capping introduced on Metrolink

Passengers travelling on Manchester Metrolink can now take advantage of weekly capping when using contactless payments. The Bee Flex Weekly launched on Monday 6th September and now means people can make unlimited Metrolink journeys and never pay more than a … Continue reading →

Posted in Manchester Metrolink | Comments Off on New weekly capping introduced on Metrolink

Discounted travel to Nottingham Castle available with a NET Event Ticket

Anyone travelling to the recently reopened and revamped Nottingham Castle can now enjoy discounted tram travel with the NET Event Ticket now available for a return trip to the Castle which has seen a £30 million transformation over the past … Continue reading →

Posted in Nottingham Express Transit | Comments Off on Discounted travel to Nottingham Castle available with a NET Event Ticket

New adverts still keep coming on Metrolink

One of the surest signs of a return to some sort of normality is the number of new adverts we have seen on Manchester Metrolink in recent months – although the latest design is for a company who have probably … Continue reading →

Posted in Manchester Metrolink | Comments Off on New adverts still keep coming on Metrolink