Tyne and Wear Metro services will run up to every 10 minutes from Sunday 13th December as part of North East Mayor Kim McGuinness’ plan to transform the network. This will see six trains a hour on most of the network, although the Sunderland line will have to wait a bit longer for that frequency with infrastructure works required which will happen in spring 2027.
Kim McGuinness explains more: “Starting from December, we’re bringing in more trains every week, including at least six trains an hour from St James to South Shields and between Airport and Pelaw– that’s a train every 10 minutes. And it’s a train about every five minutes at busy stations like Haymarket, Central and Gateshead, meaning less time waiting at your local station and a better, safer and more frequent Metro for so many passengers.
“But I know that’s not good enough because for people in Sunderland these improvements will be delayed. Which is why I am making clear that from the spring, once further necessary upgrades have been made, this frequency will also be introduced to the Sunderland line, meaning we’ll have a fully upgraded Metro timetable for all.
“Every person in our region deserves a world class transport network. We promised to make Metro better for local people, and we’re delivering. We have our entire new fleet out on the network, performance is improving, and we’ve made travel more affordable. The increase in services is another step towards better, safer journeys for people in our whole region.”
The new timetable has been made possible thanks to the introduction of the complete fleet of 46 new Stadler trains as well as the Metro Flow project which saw dual track infrastructure installed in South Tyneside.
Initial improvements to the service will be seen Monday to Friday between 0630 and 1830 with trains due to run every 10 minutes on the Yellow line between St James and South Shield, and on the Green line between Airport and Pelaw. This will lead to a 4-6 minute frequency on the central core between South Gosforth and Pelaw.
There will also be earlier first trains into Newcastle City Centre from Benton, Tynemouth, North Shields, Howdon, Bede, St James and Airport with later trains back to Park Lane, Kingston Park, Longbenton (via Whitley Bay), Tynemouth and Benton.
Daytime on a Saturday will be every 12 minutes with a train every 15 minutes on a Sunday. Lower frequencies will continue to run early morning and in the evenings, but for Sunday mornings the frequency will increase from every 30 minutes to every 20 minutes.
Cathy Massarella, Managing Director of Nexus, said: “The new Metro timetable is going to be transformative for our customers, and has been made by possible by the roll out of our new train fleet.
“Introducing six trains per hour is a major step forward and will give our customers a turn-up-and-go service, offering greater convenience and reduced waiting times.
“The new timetable provides more capacity for future growth, helps realise the benefits of our new fleet, and makes public transport an even more attractive choice for people travelling across the region.
“Introducing our new train fleet combined with our track dualling work in South Tyneside, the Metro Flow project, have paved the way for this change.
“Customers across most of the system will benefit from the increase from December, with the Sunderland line scheduled to follow once specialist infrastructure upgrades and testing work are completed.”