In Pictures: Pinfold Street Metro extension works

With work to extend West Midlands Metro towards Edgbaston continuing, Pinfold Street is a hive of activity with a floating slab being installed to prevent vibration in this narrow street where trams will be running at some point in 2019 as part of the first stage of the extension. Ian Nightingale with the photo.

A view up Pinfold Street showing preparations being made for the installation of track. Gas pipe divesions have now been completed and concrete is now being poured for the floating track slab which is designed to minimise vibration once trams are running. (Photograph by Ian Nightingale, 24th October 2018)

This entry was posted in West Midlands Metro. Bookmark the permalink.