Emergency engineering works on Metrolink: Sunday 29th June 2025

In addition to the ongoing major work taking place in Manchester City Centre, Transport for Greater Manchester have confirmed that there will be emergency works at Deansgate-Castlefield on Sunday 29th June 2025 impacting services going through this stop.

The work is needed to fix a track fault here and whilst some trams from the south of Manchester will still operate as far as Deansgate-Castlefield no services will be able to go into the city centre from the start of service until around 1400.

During this period services will run as follows:

  • Manchester Airport to Firswood
  • The Trafford Centre to Cornbrook
  • Eccles to Cornbrook via MediaCityUK
  • Altrincham to Deansgate-Castlefield
  • East Disbury to Deansgate-Castlefield
  • Ashton-under-Lyne to Piccadilly
  • Etihad Campus to Piccadilly
  • Rochdale Town Centre to Exchange Square
  • Bury to Victoria

With it being a Sunday the frequency will be every 15 minutes.

There will be a replacement bus service operating between Deansgate-Castlefield, St Peter’s Square and Piccadilly Station.

Services will start to get back to (current) normality from 1400 although it may take a little bit of time for services to fully reform.

The service pattern post-1400 will be:

  • Manchester Airport to Victoria
  • The Trafford Centre to Deansgate-Castlefield
  • Eccles to Victoria via MediaCityUK
  • Altrincham to Bury
  • East Disbury to Rochdale Town Centre
  • Ashton-under-Lyne to Piccadilly
  • Etihad Campus to Piccadilly

 

This entry was posted in Manchester Metrolink. Bookmark the permalink.