In Pictures: Latest construction shots of Tram-Train pilot

The major construction project to ensure that Tram-Train services will be able to run between Stagecoach Supertram and national rail tracks to Rotherham Central and Parkgate is continuing at its own pace with most attention currently being concentrated on Rotherham Central. Glyn Hill provides the photos.

The Sheffield side of Rotherham Central where slow progress continues to be made on the low level platform and associated connection with the national rail platform.

Overhead in place between Rotherham Central and Greasebrough Road.

An entrance to the low floor tram-train platform will be constructed here. (All Photographs by Glyn Hill)

This entry was posted in South Yorkshire Supertram. Bookmark the permalink.