Movement for the Manchester Metrolink M5000s

It is another case of one into service and one arriving on Manchester Metrolink over the past week with M5000 3097 carrying passengers for the first time and 3098 being delivered to its new home. 3097 entered service on Saturday 18th April running on the Eccles to Ashton-under-Lyne service (as with all recent arrivals the tram is joining the non-ATS/VRS fleet based at Trafford) and then seven days later 3098 made the trip from mainland Europe to Queens Road Depot, arriving at lunchtime before being unloaded and moved into the depot buildings for its commissioning to start.

This entry was posted in Manchester Metrolink. Bookmark the permalink.