Luas Engineering Works: Easter weekend

The next set of rail replacement works on Dublin’s Luas network will see services on the Red line impacted over the Easter weekend. The location of these latest works will be at Heuston and will once again see a split service running on this line.

The work will get underway from the start of service on Saturday 30th March until the end of service on Monday 1st April. During this time the following tram service will run on the Red line:

  • Tallaght/Saggart to Blackhorse
  • Heuston to The Point

There will be a replacement bus service operating every 15 minutes from Heuston to Blackhorse. Owing to limited bus set down areas the eastbound bus will only serve Blackhorse and Heuston whilst the westbound bus will call at Heuston, James’s, Suir Road, Drimnagh and Blackhorse.

There are no changes to Green line services as a result of these works.

This entry was posted in Dublin Luas. Bookmark the permalink.