Manchester Metrolink Engineering Work: Saturday 11 and Sunday 12 May

The planned engineering work on the Bury line of Manchester Metrolink on Saturday 11 May has now been cancelled with a normal service running across the network throughout on this day. The engineering works due to take place on Sunday 12 May will also be altered with trams now running between Bury and Crumpsall with a replacement bus running from there to Piccadilly all day. The previously advertised changes on the Rochdale line will remain in place with no trams between Central Park and Victoria all day and Rochdale Railway Station stop being closed until 1500, again replacement buses will operate.

This entry was posted in Manchester Metrolink. Bookmark the permalink.