The Manchester Metrolink performance statistics seem to have gone quarterly with the last three periods data all released in one go recently. Covering the first three periods of the 2021/22 financial year between 1st April and 26th June 2021 they show that there has been a fall in both punctuality and reliability, although both remain over 90%.
Punctuality
Trams departing less than 2 minutes late
Period 1 – 93.9%
Period 2 – 93.7%
Period 3 – 91.4%
(Period 13 – 94.4%)
Highest performing line was Trafford Park line (95.3%)
Lowest performing line was Altrincham (85.8%)
Reliability
Percentage of planned miles operated
Period 1 – 97.4%
Period 2 – 97.7%
Period 3 – 96.4%
(Period 13 – 97.1%)
Highest performing line was Bury (99.1%)
Lowest performing line was Altrincham (92.3%)
There were also 1.40% of all planned journeys cancelled and 0.43% of all planned journeys were classified as short journeys.
- The full statistics, line by line, can be viewed on the TfGM website at https://assets.ctfassets.net/nv7y93idf4jq/jrswWMsex2TGlSHN9WMvo/a0b9e8c84030dddcebd44bf0ef7bdc6c/P1-3_26.06.21_Performance_poster.pdf