Reduced Tram-Train service on Sundays

Tram-Train services between Cathedral and Rotherham Parkgate will run to a reduced timetable for four consecutive Sundays from 13th January to allow for Network Rail engineering works. For most of the day only two services an hour will run (instead of the usual three) although there is no intermediate service between 0939 and 1039 from Cathedral. First tram remains at 0827 from Cathedral and 0859 from Rotherham Parkgate with the final through Cathedral-Parkgate service at 1800 (1831 back). This revised service will run on Sundays 13th, 20th, 27th January and 3rd February only.

This entry was posted in South Yorkshire Supertram. Bookmark the permalink.