Manchester Metrolink Engineering Works: Sunday 15th July

Engineering works on Manchester Metrolink on Sunday 15th July will see no trams
running between St Werburgh’s Road and Trafford Bar. A replacement bus will operate between these two stops calling at all stops. As a result of these works all trams from Oldham will run into Piccadilly Station instead.

This entry was posted in Manchester Metrolink. Bookmark the permalink.