Overhead problems cause delays for Tramlink

Services between Wimbledon and Therapia Lane were suspended on Tuesday 10th December during the morning rush hour after a fault with the overhead lines was discovered. Engineers were quickly despatched to the scene to repair the fault but trams were unable to resume until shortly after 1000.

This entry was posted in London Trams. Bookmark the permalink.