In Pictures: Hillsborough Corner trackworks

On Sunday 27th September further trackworks took place on the Stagecoach Supertram network in addition to the major rail replacement work at Crystal Peaks. This time the work was concentrated at Hillsborough Corner at the junction between the Blue and Yellow routes on the trackbed surrounding the rails, Stuart Cooke took a look at the work underway and also the finished worksite.

A view of the general worksite which work having already started on improving the quality of the trackbed.

Work on the curve.

Another part of the worksite.

The finished section of track. As can be seen attention was on the trackbed surrounding the track with evidence of the fresh tarmac put down after this was completed. (All Photographs by Stuart Cooke)

This entry was posted in South Yorkshire Supertram. Bookmark the permalink.