The terminus coming up from South Hylton was at Brockley Whins and 4085+4077 are pictured on Platform 2. Having off-loaded the passengers it worked empty to the cross-over in the distance and worked back into Platform 1 to return south. The line that can be seen on the right of the picture is to Tyne Dock with biomass replacing coal as the main train loads.
In Pictures: Tyne & Wear Metro Engineering Work