In Pictures: Tyne & Wear Metro Engineering Work

1.signal-th

Picture from the front of 4088 as it approaches Heworth with the signal indicating that it will work wrong way into Platform 2 via the cross-over that can be seen in the distance. Platform 2 would be its normal platform for the return trip. The lines on the left are the National Rail lines down the Durham Coast.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *