In Pictures: Tyne & Wear Metro Engineering Work

2.4085+4077-th

The terminus coming up from South Hylton was at Brockley Whins and 4085+4077 are pictured on Platform 2. Having off-loaded the passengers it worked empty to the cross-over in the distance and worked back into Platform 1 to return south. The line that can be seen on the right of the picture is to Tyne Dock with biomass replacing coal as the main train loads.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *