Hopefully if you attempt to take this photo in 12 months time you will be in danger of being run over by a tram! But in August 2021 and you’re safe with construction work still ongoing. This view shows south curve (to the left) and north curve (right) both now with wires installed.
In Pictures: North curve now wired at Talbot Square junction