In Pictures: London Tramlink Engineering Works

2550av-2

And then 2550 moves over the crossover to return to Wimbledon having terminated at Addington Village because of engineering works. (Photo: Ian Buck)

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *