In Pictures: Winter workshop activity at Crich

3.74+102-pw

Sheffield 74 had to be moved outside on 3rd December to release Newcastle 102 from the back of the depot as part of a shunting operation. Here we see 74 in the depot yard as 102 is moved through the depot gates.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *