In Pictures: More excellent progress on new tram depot at EATM

1.depot-tm

The shute from the cement mixer is seen on the far left of this shot as work to level out the concrete takes place. This is the section between the two tracks within the depot.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *