This is the view at the foot of the viaduct over the Network Rail line at Pelaw with the track dualled and the freight line from the Network Rail line pictured on the left. South Shields bound Metros now use what was the freight line. Oil traffic to the Jarrow Oil Terminal will work through the platforms at Hebburn and Jarrow. Much of the disused freight line has not been lifted yet.
In Pictures: Metro services resume to South Shields