In Pictures: Progress on the Metro Flow project

1.metrotrack-th

The track on the right with the end of the Network Rail ballast train on is the freight only line into the Jarrow Oil Terminal from the Network Rail line at Pelaw. At the top is the single Metro line which runs from to Pelaw and which runs down beside the freight line. This section is on the schedule to be dualled.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *