In Picture: Tamper at work in Blackpool

8.tamper-an

The tamper is then transferred to the southbound track and after unloading from the trailer waits to be lowered onto the tracks. (All Photographs taken on 20th February 2021)

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *