On 3rd September and 40 is almost ready for departure to Crich with lifeguards and trolley removed. The tram stands on road 1 in the depot waiting for its ride home. (Photograph by Trevor Hall, 3rd September 2019)
In Pictures: Box 40 runs for the last time at Beamish