News & Features | Fleet Lists | Photos | Events Diary | Tram of the Year | About the Site | Email

Home > Photos Index > Gallery 818

Gallery 818: Metrolink Trafford Park construction - 30th July 2019


After Parkway stop the line passes through Parkway Circle and climbs up in the median strip of Parkway to the point where it crosses the northbound carriageway to run alongside the highway and over the Bridgewater Canal. This track has been in place for some time but recently overhead line poles have been erected. The track alongside Parkway is not easily visible to photograph but overhead line poles have now been erected.

<<<< Previous Photo Return to Gallery 818 Index Next Photo >>>>

Return to Photos Index

This page was last updated on Sunday 4th August 2019


British Trams Online is run by enthusiasts for enthusiasts. All information contained on these pages is correct to the best of knowledge but mistakes will inevitably occasionally appear and if this happens we will correct it as soon as possible. Opinions expressed on these pages are those of the writer(s) and do not necessarily reflect the opinion of British Trams Online or any organisations we are associated with. Cookies may be used on this website and if you continue reading the site without changing your settings we assume you are happy to receive these. If you have any comments, suggestions or corrections please email.