{"id":58897,"date":"2025-06-16T22:00:26","date_gmt":"2025-06-16T21:00:26","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=58897"},"modified":"2025-06-16T12:58:33","modified_gmt":"2025-06-16T11:58:33","slug":"in-pictures-construction-continues-on-eastside-extension","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=58897","title":{"rendered":"In Pictures: Construction continues on Eastside extension"},"content":{"rendered":"<p>The Birmingham Eastside extension of the West Midlands Metro should be one of two new sections of line on the network to open by the end of this year (albeit just a small part of it) \u2013 the other being the Black Country line as far as Dudley of course. In preparation for trams to start running as far as the Clayton Hotel, the Midland Metro Alliance have been continuing work in recent months and in this pictorial update Ken Jones takes a quick look at recent progress around Moor Street Queensway.<\/p>\n<p><!--more--><\/p>\n<p>Eventually the Eastside extension will run for 1.7km between the junction at Corporation Street in Birmingham City Centre to High Street Deritend. It provides key connections to Birmingham Coach Station as well as the HS2 Station at Curzon Street, and as we\u2019ve seen following recent funding announcements will also provide the start of a line out to the new Birmingham City FC stadium and beyond.<\/p>\n<p>The construction of the line has been beset with delays, and they are mainly down to the HS2 works around Curzon Street. The Midland Metro Alliance will not be given access to this area until the HS2 team have finished and so this would have significantly delayed the opening of the complete line as far as Digbeth. That\u2019s when a decision was made to build a temporary stop by the Clayton Hotel on Moor Street Queensway, with this due to be completed in time for opening by the end of this year (or possibly in early 2026).<\/p>\n<div id=\"attachment_58898\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/1.eastside-kj.jpg\"><img aria-describedby=\"caption-attachment-58898\" loading=\"lazy\" class=\"size-medium wp-image-58898\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/1.eastside-kj-550x368.jpg\" alt=\"\" width=\"550\" height=\"368\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/1.eastside-kj-550x368.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/1.eastside-kj-768x513.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/1.eastside-kj.jpg 1287w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-58898\" class=\"wp-caption-text\">This is the view outside the Clayton Hotel looking towards Curzon Street. The viaduct for HS2 can be seen in the distance on the right and the building in the centre is old railway station building which will be included as part of the new HS2 complex. Birmingham City University \u2013 an advertiser on the Metro \u2013 is on the left. Tracks are down and landscaping is in progress.<\/p><\/div>\n<div id=\"attachment_58899\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/2.eastside-kj.jpg\"><img aria-describedby=\"caption-attachment-58899\" loading=\"lazy\" class=\"size-medium wp-image-58899\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/2.eastside-kj-550x368.jpg\" alt=\"\" width=\"550\" height=\"368\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/2.eastside-kj-550x368.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/2.eastside-kj-768x513.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/2.eastside-kj.jpg 1287w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-58899\" class=\"wp-caption-text\">View across to Albert Street where we see the tramstop \u2013 island platform \u2013 under construction. Tracks are down and final road surface is already in place.<\/p><\/div>\n<div id=\"attachment_58900\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/3.eastside-kj.jpg\"><img aria-describedby=\"caption-attachment-58900\" loading=\"lazy\" class=\"size-medium wp-image-58900\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/3.eastside-kj-550x368.jpg\" alt=\"\" width=\"550\" height=\"368\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/3.eastside-kj-550x368.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/3.eastside-kj-768x513.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/3.eastside-kj.jpg 1287w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-58900\" class=\"wp-caption-text\">A crossover is being installed here to allow this to be a temporary terminus and further track is to be laid beyond Clayton Hotel as the line continues.<\/p><\/div>\n<div id=\"attachment_58901\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/4.eastside-kj.jpg\"><img aria-describedby=\"caption-attachment-58901\" loading=\"lazy\" class=\"size-medium wp-image-58901\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/4.eastside-kj-550x368.jpg\" alt=\"\" width=\"550\" height=\"368\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/4.eastside-kj-550x368.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/4.eastside-kj-768x513.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2025\/06\/4.eastside-kj.jpg 1287w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-58901\" class=\"wp-caption-text\">A plan affixed to the fencing showing the work which is planned or has already been completed. Of note here is that it states the OLE was being energised at the Bull Street end of the line on 3rd May 2025. (All Photographs by Ken Jones, 13th June 2025)<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Birmingham Eastside extension of the West Midlands Metro should be one of two new sections of line on the network to open by the end of this year (albeit just a small part of it) \u2013 the other being &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=58897\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[18],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/58897"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=58897"}],"version-history":[{"count":1,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/58897\/revisions"}],"predecessor-version":[{"id":58902,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/58897\/revisions\/58902"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=58897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=58897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=58897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}