{"id":48880,"date":"2023-03-30T22:00:13","date_gmt":"2023-03-30T21:00:13","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=48880"},"modified":"2023-03-29T09:57:20","modified_gmt":"2023-03-29T08:57:20","slug":"in-pictures-another-tram-heads-to-dudley-and-testing-of-new-trams-continues","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=48880","title":{"rendered":"In Pictures: Another tram heads to Dudley and testing of new trams continues"},"content":{"rendered":"<p>In the dead of the night as all is calm and most people are resting for the next day ahead there are often key movements taking place on the West Midlands Metro with lorries coming to bring and remove trams whilst other trams go about testing ahead of their entry into service. The night of Friday 24<sup>th<\/sup> and Saturday 25<sup>th<\/sup> March was one such night when Allely\u2019s were back in town to take another tram to Dudley for bodyside repairs whilst one of the latest Urbos100 trams was out on test.<\/p>\n<p><!--more--><\/p>\n<p>The tram which departed this time was <strong>25<\/strong> and it has now joined <strong>24<\/strong> at the Very Light Rail Innovation Centre in Dudley where it will undergo bodyside repairs to sort out the cracks which have been discovered on these trams (and, of course, saw the service completely suspended on a couple of occasions in 2021\/2022).<\/p>\n<p>With access to the depot at Wednesbury still limited because of construction works the loading of <strong>25<\/strong> took place on Bilston Road again. The Allely\u2019s low loader arrived after the final service tram of the day had passed (and thus removing the need for the service to be curtailed earlier than normal) and <strong>25<\/strong> was towed north by <strong>36<\/strong> to allow this loading to take place in the early hours of Saturday 25<sup>th<\/sup> March. The tram has now been transferred to Dudley and work is underway on its repairs to allow it to return to service.<\/p>\n<p>Whilst on one hand repairs are taking place to the Urbos3 trams, on the other the latest generation of CAF trams, the Urbos100s, are continuing to be tested in preparation for them to enter service. We\u2019ve previously mentioned that two Urbos100s crept in without being noticed and these are now confirmed as being both <strong>51<\/strong> and <strong>53<\/strong> and came on the same evening. <strong>53<\/strong> has already undergone extensive overnight testing and now <strong>51<\/strong> has been noted out of the depot undergoing this initial test runs.<\/p>\n<div id=\"attachment_48881\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=48881\" rel=\"attachment wp-att-48881\"><img aria-describedby=\"caption-attachment-48881\" loading=\"lazy\" class=\"size-medium wp-image-48881\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/1.25-mm-550x310.jpg\" alt=\"\" width=\"550\" height=\"310\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/1.25-mm-550x310.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/1.25-mm-1024x576.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/1.25-mm-768x432.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/1.25-mm.jpg 1286w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-48881\" class=\"wp-caption-text\">This video capture shows 25 being towed north to Bilston Road by 36. Allely\u2019s were waiting on Bilston Road to take the tram to Dudley.<\/p><\/div>\n<div id=\"attachment_48882\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=48882\" rel=\"attachment wp-att-48882\"><img aria-describedby=\"caption-attachment-48882\" loading=\"lazy\" class=\"size-medium wp-image-48882\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/2.53-mm-550x413.jpg\" alt=\"\" width=\"550\" height=\"413\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/2.53-mm-550x413.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/2.53-mm-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/2.53-mm-768x576.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/2.53-mm.jpg 1280w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-48882\" class=\"wp-caption-text\">53 was also out on the same night as its testing continues. This is Wednesbury Parkway with the depot complex seen in the background. (Photographs x2 by Michael Morton, 25th March 2023)<\/p><\/div>\n<div id=\"attachment_48883\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=48883\" rel=\"attachment wp-att-48883\"><img aria-describedby=\"caption-attachment-48883\" loading=\"lazy\" class=\"size-medium wp-image-48883\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2023\/03\/3.51-aw-550x413.jpg\" alt=\"\" width=\"550\" height=\"413\" \/><\/a><p id=\"caption-attachment-48883\" class=\"wp-caption-text\">51 is seen here from a passing tram as it sits inside the depot having started its testing. (Photograph by Andy Walters, 28th March 2023)<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>In the dead of the night as all is calm and most people are resting for the next day ahead there are often key movements taking place on the West Midlands Metro with lorries coming to bring and remove trams &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=48880\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":48882,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[18],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/48880"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=48880"}],"version-history":[{"count":1,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/48880\/revisions"}],"predecessor-version":[{"id":48884,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/48880\/revisions\/48884"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/media\/48882"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=48880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=48880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=48880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}