{"id":42837,"date":"2021-12-12T14:00:55","date_gmt":"2021-12-12T14:00:55","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=42837"},"modified":"2021-12-11T18:08:03","modified_gmt":"2021-12-11T18:08:03","slug":"in-pictures-wilkos-wiring-work-coming-to-a-conclusion","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=42837","title":{"rendered":"In Pictures: Wilko\u2019s wiring work coming to a conclusion"},"content":{"rendered":"<p>Nearly there! The work to finish the overhead wiring on the Blackpool Tramway extension from Talbot Square, along Talbot Road to a new terminus close to Blackpool North Railway is starting to reach an end with the last few days having seen further progress within the old Wilko\u2019s site.<\/p>\n<p><!--more--><\/p>\n<p>This progress has included the installation of the previously missing frog at the terminus whilst an extra feeder wire is being added on the curve. This follows on from the work completed over the previous few weeks which has seen overhead poles put into place following by the bulk of the overhead wiring.<\/p>\n<p>Although the wiring side of the project is almost complete along the length of the extension, there does remain other work to be completed before we can even contemplate riding on a tram up Talbot Road. This includes the completion of the new terminus and the installation of signalling. But we really are starting to get there and unless there are any unforeseen issues hopefully by this time next year there will be regular trams to Blackpool North Railway Station!<\/p>\n<div id=\"attachment_42838\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=42838\" rel=\"attachment wp-att-42838\"><img aria-describedby=\"caption-attachment-42838\" loading=\"lazy\" class=\"size-medium wp-image-42838\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/1.overhead-ta-550x367.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/1.overhead-ta-550x367.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/1.overhead-ta-1024x683.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/1.overhead-ta-768x512.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/1.overhead-ta.jpg 1296w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-42838\" class=\"wp-caption-text\">In this first shot \u2013 the \u201cclassic\u201d shot we have seen many times during the construction period \u2013 we look towards the scissors crossover with wiring and frog in place.<\/p><\/div>\n<div id=\"attachment_42839\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=42839\" rel=\"attachment wp-att-42839\"><img aria-describedby=\"caption-attachment-42839\" loading=\"lazy\" class=\"size-medium wp-image-42839\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/2.overhead-ta-550x367.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/2.overhead-ta-550x367.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/2.overhead-ta-1024x683.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/2.overhead-ta-768x512.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/2.overhead-ta.jpg 1296w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-42839\" class=\"wp-caption-text\">Another photo across the site towards the new hotel and restaurant.<\/p><\/div>\n<div id=\"attachment_42840\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=42840\" rel=\"attachment wp-att-42840\"><img aria-describedby=\"caption-attachment-42840\" loading=\"lazy\" class=\"size-medium wp-image-42840\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/3.overhead-ta-550x367.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/3.overhead-ta-550x367.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/3.overhead-ta-1024x683.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/3.overhead-ta-768x512.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/3.overhead-ta.jpg 1296w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-42840\" class=\"wp-caption-text\">The reverse view out of the worksite.<\/p><\/div>\n<div id=\"attachment_42841\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=42841\" rel=\"attachment wp-att-42841\"><img aria-describedby=\"caption-attachment-42841\" loading=\"lazy\" class=\"size-medium wp-image-42841\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/4.overhead-ta-550x367.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/4.overhead-ta-550x367.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/4.overhead-ta-1024x683.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/4.overhead-ta-768x512.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2021\/12\/4.overhead-ta.jpg 1296w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-42841\" class=\"wp-caption-text\">A final shot at Wilko\u2019s with a new feeder cable being installed on the curve. (All Photographs by Tony Armitage, 11th December 2021)<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Nearly there! The work to finish the overhead wiring on the Blackpool Tramway extension from Talbot Square, along Talbot Road to a new terminus close to Blackpool North Railway is starting to reach an end with the last few days &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=42837\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[7],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/42837"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42837"}],"version-history":[{"count":1,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/42837\/revisions"}],"predecessor-version":[{"id":42842,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/42837\/revisions\/42842"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}