{"id":35876,"date":"2020-10-07T20:00:48","date_gmt":"2020-10-07T19:00:48","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=35876"},"modified":"2020-10-07T16:43:59","modified_gmt":"2020-10-07T15:43:59","slug":"more-metrolink-engineering-works-on-the-way","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=35876","title":{"rendered":"More Metrolink engineering works on the way"},"content":{"rendered":"<p>There will be engineering works on Manchester Metrolink on two Sundays in October which will see a change in services on both days. The first set of works (11<sup>th<\/sup> October) will affect trams through the City Centre with those on the second day (25<sup>th<\/sup> October) on the Eccles line.<\/p>\n<p><!--more--><\/p>\n<p><strong>Sunday 11<sup>th<\/sup> October<\/strong><\/p>\n<p>No trams will be able to run from the start of service until 1600 between Deansgate-Castlefield and Victoria\/Piccadilly.<\/p>\n<p>Trams from the Airport will terminate at Cornbrook<\/p>\n<p>Trams from Altrincham will terminate at Deansgate-Castlefield<\/p>\n<p>Trams from Ashton will terminate at Piccadilly<\/p>\n<p>Trams from Bury will run to Ashton-under-Lyne<\/p>\n<p>Trams from Eccles will terminate at Deansgate-Castlefield<\/p>\n<p>Trams from Rochdale will terminate at Exchange Square<\/p>\n<p>Trams from East Didsbury will terminate at Deansgate-Castlefield<\/p>\n<p>Bus replacements will be in operation until 1600 after which services will resume through the city centre with trams from Bury running through to Ashton-under-Lyne and those from Ecccles at Deansgate-Castlefield.<\/p>\n<p><strong>Sunday 25<sup>th<\/sup> October<\/strong><\/p>\n<p>Improvement works are taking place at MediaCityUK with no trams running on the Eccles line all day.<\/p>\n<p>Services from Ashton will run through to Bury with a \u00a0replacement bus service running every 15 minutes between Eccles and Piccadilly.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>There will be engineering works on Manchester Metrolink on two Sundays in October which will see a change in services on both days. The first set of works (11th October) will affect trams through the City Centre with those on &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=35876\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[17],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/35876"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=35876"}],"version-history":[{"count":1,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/35876\/revisions"}],"predecessor-version":[{"id":35877,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/35876\/revisions\/35877"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=35876"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=35876"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=35876"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}