{"id":21828,"date":"2018-04-25T20:30:43","date_gmt":"2018-04-25T19:30:43","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=21828"},"modified":"2018-04-25T18:20:32","modified_gmt":"2018-04-25T17:20:32","slug":"in-pictures-attercliffe-track-replacement-work","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=21828","title":{"rendered":"In Pictures: Attercliffe track replacement work"},"content":{"rendered":"<p>As well as the Tram-Train overhead work during the period 20th to 22nd April the chance was also taken to replace a short section of track at Attercliffe which saw an extended bus replacement service operate from the city centre along the Yellow route to Meadowhall. In these photos we take a look at the work courtesy of Mike Haddon and Martin Miller.<\/p>\n<p><!--more--><\/p>\n<div id=\"attachment_21829\" style=\"width: 422px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21829\" rel=\"attachment wp-att-21829\"><img aria-describedby=\"caption-attachment-21829\" loading=\"lazy\" class=\"size-medium wp-image-21829\" title=\"1.attercliffe-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.attercliffe-mh-412x550.jpg\" alt=\"\" width=\"412\" height=\"550\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.attercliffe-mh-412x550.jpg 412w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.attercliffe-mh-768x1024.jpg 768w\" sizes=\"(max-width: 412px) 100vw, 412px\" \/><\/a><p id=\"caption-attachment-21829\" class=\"wp-caption-text\">A view of the worksite looking eastbound with rails removed from Shirland Lane level crossing.<\/p><\/div>\n<div id=\"attachment_21830\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21830\" rel=\"attachment wp-att-21830\"><img aria-describedby=\"caption-attachment-21830\" loading=\"lazy\" class=\"size-medium wp-image-21830\" title=\"2.attercliffe-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.attercliffe-mh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.attercliffe-mh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.attercliffe-mh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.attercliffe-mh.jpg 1277w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21830\" class=\"wp-caption-text\">Looking west at the crossing with Attercliffe tramstop in the background. (Photographs x2 by Mike Haddon)<\/p><\/div>\n<div id=\"attachment_21856\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21856\" rel=\"attachment wp-att-21856\"><img aria-describedby=\"caption-attachment-21856\" loading=\"lazy\" class=\"size-medium wp-image-21856\" title=\"3,attercliffe-mm\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3attercliffe-mm-550x367.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3attercliffe-mm-550x367.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3attercliffe-mm-1024x683.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3attercliffe-mm.jpg 1267w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21856\" class=\"wp-caption-text\">On Sunday 22nd April with the work completed ahead of schedule the tidying up operation is underway.Another view of the last stages of the work. (Photographs x 2 by Martin Miller)<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>As well as the Tram-Train overhead work during the period 20th to 22nd April the chance was also taken to replace a short section of track at Attercliffe which saw an extended bus replacement service operate from the city centre &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=21828\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/21828"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21828"}],"version-history":[{"count":8,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/21828\/revisions"}],"predecessor-version":[{"id":21863,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/21828\/revisions\/21863"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}