{"id":21817,"date":"2018-04-24T19:29:49","date_gmt":"2018-04-24T18:29:49","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=21817"},"modified":"2018-04-24T19:29:49","modified_gmt":"2018-04-24T18:29:49","slug":"in-pictures-key-tram-train-construction-milestone-reached","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=21817","title":{"rendered":"In Pictures: Key Tram-Train construction milestone reached"},"content":{"rendered":"<p>A major milestone in the construction work required for Tram-Train services to start later this year was reached over the weekend with overhead wires now in place connecting the current South Yorkshire Supertram system with Network Rail metals at Tinsley Junction. Supertram services were suspended from Friday 20th April until Sunday 22nd April to allow the work \u2013 and rail replacement work at Attercliffe \u2013 which was actually a day shorter than planned with all the work taking less time than expected \u2013 its nice to report on engineering work being finished early!<\/p>\n<p><!--more--><\/p>\n<div id=\"attachment_21818\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21818\" rel=\"attachment wp-att-21818\"><img aria-describedby=\"caption-attachment-21818\" loading=\"lazy\" class=\"size-medium wp-image-21818\" title=\"1.tinsley-gh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.tinsley-gh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.tinsley-gh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.tinsley-gh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/1.tinsley-gh.jpg 1248w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21818\" class=\"wp-caption-text\">Looking from Meadowhall South stop towards Meadowhall and Tinsley Junction where the Tram-Train service will diverge on the right away from the mainline.<\/p><\/div>\n<div id=\"attachment_21819\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21819\" rel=\"attachment wp-att-21819\"><img aria-describedby=\"caption-attachment-21819\" loading=\"lazy\" class=\"size-medium wp-image-21819\" title=\"2.tinsley-gh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.tinsley-gh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.tinsley-gh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.tinsley-gh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/2.tinsley-gh.jpg 1248w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21819\" class=\"wp-caption-text\">Work underway on installing the overhead.<\/p><\/div>\n<div id=\"attachment_21820\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21820\" rel=\"attachment wp-att-21820\"><img aria-describedby=\"caption-attachment-21820\" loading=\"lazy\" class=\"size-medium wp-image-21820\" title=\"3.tinsley-gh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3.tinsley-gh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3.tinsley-gh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3.tinsley-gh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/3.tinsley-gh.jpg 1248w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21820\" class=\"wp-caption-text\">As work continues on the overhead we look towards the mainline showing the junction. (Photographs x3 by Glyn Hill)<\/p><\/div>\n<div id=\"attachment_21821\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21821\" rel=\"attachment wp-att-21821\"><img aria-describedby=\"caption-attachment-21821\" loading=\"lazy\" class=\"size-medium wp-image-21821\" title=\"4.tinsley-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/4.tinsley-mh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/4.tinsley-mh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/4.tinsley-mh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/4.tinsley-mh.jpg 1277w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21821\" class=\"wp-caption-text\">Further work taking place on installing the overhead on Tinsley Chord.<\/p><\/div>\n<div id=\"attachment_21822\" style=\"width: 422px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21822\" rel=\"attachment wp-att-21822\"><img aria-describedby=\"caption-attachment-21822\" loading=\"lazy\" class=\"size-medium wp-image-21822\" title=\"5.tinsley-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/5.tinsley-mh-412x550.jpg\" alt=\"\" width=\"412\" height=\"550\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/5.tinsley-mh-412x550.jpg 412w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/5.tinsley-mh-768x1024.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/5.tinsley-mh.jpg 958w\" sizes=\"(max-width: 412px) 100vw, 412px\" \/><\/a><p id=\"caption-attachment-21822\" class=\"wp-caption-text\">Overhead installation on the section east of the Tinsley road viaduct, where the &#39;Chord&#39; curves to the north-east to run parallel with Network Rail&#39;s Tinsley freight only line.<\/p><\/div>\n<div id=\"attachment_21823\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21823\" rel=\"attachment wp-att-21823\"><img aria-describedby=\"caption-attachment-21823\" loading=\"lazy\" class=\"size-medium wp-image-21823\" title=\"6.rotherham-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/6.rotherham-mh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/6.rotherham-mh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/6.rotherham-mh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/6.rotherham-mh.jpg 1277w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21823\" class=\"wp-caption-text\">Work is also still continuing at Rotherham Central on construction of the platforms. This is a view from the station\u2019s main platform 2 showing that despite the installation of a shelter there is till much work to be done.<\/p><\/div>\n<div id=\"attachment_21824\" style=\"width: 422px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21824\" rel=\"attachment wp-att-21824\"><img aria-describedby=\"caption-attachment-21824\" loading=\"lazy\" class=\"size-medium wp-image-21824\" title=\"7.rotherham-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/7.rotherham-mh-412x550.jpg\" alt=\"\" width=\"412\" height=\"550\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/7.rotherham-mh-412x550.jpg 412w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/7.rotherham-mh-768x1024.jpg 768w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/7.rotherham-mh.jpg 958w\" sizes=\"(max-width: 412px) 100vw, 412px\" \/><\/a><p id=\"caption-attachment-21824\" class=\"wp-caption-text\">A close-up of the shelter.<\/p><\/div>\n<div id=\"attachment_21825\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=21825\" rel=\"attachment wp-att-21825\"><img aria-describedby=\"caption-attachment-21825\" loading=\"lazy\" class=\"size-medium wp-image-21825\" title=\"8.rotherham-mh\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/8.rotherham-mh-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/8.rotherham-mh-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/8.rotherham-mh-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2018\/04\/8.rotherham-mh.jpg 1277w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-21825\" class=\"wp-caption-text\">Looking across the tracks with the outbound platform in lower foreground and the mainline railway station in the left background. (Photographs x5 by Mike Haddon)<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>A major milestone in the construction work required for Tram-Train services to start later this year was reached over the weekend with overhead wires now in place connecting the current South Yorkshire Supertram system with Network Rail metals at Tinsley &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=21817\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/21817"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21817"}],"version-history":[{"count":2,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/21817\/revisions"}],"predecessor-version":[{"id":21827,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/21817\/revisions\/21827"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}