{"id":13406,"date":"2015-12-13T11:53:00","date_gmt":"2015-12-13T10:53:00","guid":{"rendered":"http:\/\/www.britishtramsonline.co.uk\/news\/?p=13406"},"modified":"2015-12-13T11:53:00","modified_gmt":"2015-12-13T10:53:00","slug":"in-pictures-stagecoach-supertram-120-in-service","status":"publish","type":"post","link":"https:\/\/www.britishtramsonline.co.uk\/news\/?p=13406","title":{"rendered":"In Pictures: Stagecoach Supertram 120 in service"},"content":{"rendered":"<p>As we have already reported the \u201cnew\u201d Stagecoach Supertram <strong>120<\/strong> is now in service following the completion of collision damage repairs in the Nunnery Square Depot workshops. The no, 2 end of the tram is the section which has been taken from the former <strong>118<\/strong> with a full repaint into the Cream and Blue livery commemorating the original tramway in the city. Photograph courtesy of Stuart Cooke.<\/p>\n<p><!--more--><\/p>\n<div id=\"attachment_13407\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.britishtramsonline.co.uk\/news\/?attachment_id=13407\" rel=\"attachment wp-att-13407\"><img aria-describedby=\"caption-attachment-13407\" loading=\"lazy\" class=\"size-medium wp-image-13407\" title=\"120-sc\" src=\"http:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2015\/12\/120-sc-550x412.jpg\" alt=\"\" width=\"550\" height=\"412\" srcset=\"https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2015\/12\/120-sc-550x412.jpg 550w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2015\/12\/120-sc-1024x768.jpg 1024w, https:\/\/www.britishtramsonline.co.uk\/news\/wp-content\/uploads\/2015\/12\/120-sc.jpg 1240w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/a><p id=\"caption-attachment-13407\" class=\"wp-caption-text\">The new 120 is seen at Cathedral on 12th December. This is no. 2 end which used to be part of 118. (Photograph by Stuart Cooke)<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>As we have already reported the \u201cnew\u201d Stagecoach Supertram 120 is now in service following the completion of collision damage repairs in the Nunnery Square Depot workshops. The no, 2 end of the tram is the section which has been &hellip; <a href=\"https:\/\/www.britishtramsonline.co.uk\/news\/?p=13406\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[24],"tags":[],"_links":{"self":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/13406"}],"collection":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13406"}],"version-history":[{"count":2,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/13406\/revisions"}],"predecessor-version":[{"id":13409,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=\/wp\/v2\/posts\/13406\/revisions\/13409"}],"wp:attachment":[{"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.britishtramsonline.co.uk\/news\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}